Forber & Sons LTD

Project

Conveyor Install (The Hut Group)

Warrington • Commercial

We were contracted to install a conveyor belt control system for The Hut Group’s Warrington facility, designed to improve efficiency and reliability in their operations. The installation consisted of a master control panel feeding multiple slave panels, supporting four conveyor systems. Each conveyor was fitted with emergency stop buttons for operator safety, in compliance with current regulations. To ensure a neat, reliable, and robust installation, we used basket tray containment, SY control cabling, and SWA power cabling throughout. The system was designed for durability while allowing straightforward maintenance and future expansion.

  • Master/slave control panel setup
  • Four conveyor systems installed with emergency dual channel stop safety circuits
  • Basket tray containment with SY and SWA cabling for power and control
Conveyor Install (The Hut Group) image 1
Conveyor Install (The Hut Group) image 2
Conveyor Install (The Hut Group) image 3
Conveyor Install (The Hut Group) image 4