Project
Conveyor Install (The Hut Group)
Warrington • Commercial
We were contracted to install a conveyor belt control system for The Hut Group’s Warrington facility, designed to improve efficiency and reliability in their operations. The installation consisted of a master control panel feeding multiple slave panels, supporting four conveyor systems. Each conveyor was fitted with emergency stop buttons for operator safety, in compliance with current regulations. To ensure a neat, reliable, and robust installation, we used basket tray containment, SY control cabling, and SWA power cabling throughout. The system was designed for durability while allowing straightforward maintenance and future expansion.
- Master/slave control panel setup
- Four conveyor systems installed with emergency dual channel stop safety circuits
- Basket tray containment with SY and SWA cabling for power and control